Difference between revisions of "GTS meeting 2 02 21"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
  
* Beamline:
+
* Beamline - no bake of beamline:
** Replace 3 YAG screens - no bake of beamline
+
** Replace 3 YAG screens
 
** Replace leaky right-angle valve
 
** Replace leaky right-angle valve
  

Revision as of 10:38, 1 February 2021

  • Fix/upgrade Glassman Gun PSS interlock chassis


  • Beamline - no bake of beamline:
    • Replace 3 YAG screens
    • Replace leaky right-angle valve


  • Prep Chamber:
    • Fix Transverse Manipulator
    • Fix Sb boat
    • Clean Sb pellets off chamber


  • Gun HV Chamber:
    • Replace Anode
    • Replace Pierce geometry
    • Upgrade anode HV bias feed-through to 5 kV


  • Laser:
    • Re-install 500 MHz green fiber laser
    • Install new pulse laser