Difference between revisions of "GTS meeting 2 18 19"
Jump to navigation
Jump to search
(Created page with "= '''No Beam Tasks'''= * Re-install Viewer 3 camera * Calibrate viewers * Install laser seed and pre-amp * Turn on QW Deflecting cavity = ''' Beam Commissioning''' = * Ch...") |
|||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= '''No Beam Tasks'''= | = '''No Beam Tasks'''= | ||
+ | * Re-install Viewer 3 camera | ||
+ | * Calibrate Viewers | ||
+ | * Install laser seed and pre-amp '''''(frequency = 500.000 MHz, 0 dBm)''''' | ||
+ | * Turn on DQWR Deflecting cavity | ||
+ | |||
+ | |||
+ | = ''' Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate''' = | ||
+ | * Check viewers | ||
+ | * Check magnets | ||
+ | * Check Harp | ||
+ | * Check QW Deflecting cavity | ||
+ | * Measure bunch length with QWDR cavity | ||
+ | * Check 1-D pepper-pot | ||
+ | |||
+ | |||
+ | = ''' Commissioning at 125 kV with Tune Beam''' = | ||
+ | * Measure beam emittance with Harp | ||
+ | * Measure beam emittance with 1-D pepper-pot | ||
+ | * Measure bunch length with QWDR cavity | ||
− | |||
− | |||
− | |||
− | |||
+ | = ''' Commissioning at 125 kV with CW Beam''' = | ||
+ | * Deliver 100 uA to dump | ||
+ | * Check TE011 cavity signal | ||
− | |||
− | + | = ''' Radiation Survey at 1 mA''' = | |
− |
Latest revision as of 11:20, 4 March 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp (frequency = 500.000 MHz, 0 dBm)
- Turn on DQWR Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check viewers
- Check magnets
- Check Harp
- Check QW Deflecting cavity
- Measure bunch length with QWDR cavity
- Check 1-D pepper-pot
Commissioning at 125 kV with Tune Beam
- Measure beam emittance with Harp
- Measure beam emittance with 1-D pepper-pot
- Measure bunch length with QWDR cavity
Commissioning at 125 kV with CW Beam
- Deliver 100 uA to dump
- Check TE011 cavity signal