Difference between revisions of "GTS meeting 2 18 19"

From Ciswikidb
Jump to navigation Jump to search
 
Line 3: Line 3:
 
* Calibrate Viewers  
 
* Calibrate Viewers  
 
* Install laser seed and pre-amp '''''(frequency = 500.000 MHz, 0 dBm)'''''
 
* Install laser seed and pre-amp '''''(frequency = 500.000 MHz, 0 dBm)'''''
* Turn on QW Deflecting cavity
+
* Turn on DQWR Deflecting cavity
  
  
Line 11: Line 11:
 
* Check Harp
 
* Check Harp
 
* Check QW Deflecting cavity
 
* Check QW Deflecting cavity
* Measure bunch length with QWD cavity
+
* Measure bunch length with QWDR cavity
 
* Check 1-D pepper-pot
 
* Check 1-D pepper-pot
  
Line 18: Line 18:
 
* Measure beam emittance with Harp
 
* Measure beam emittance with Harp
 
* Measure beam emittance with 1-D pepper-pot
 
* Measure beam emittance with 1-D pepper-pot
* Measure bunch length with QWD cavity
+
* Measure bunch length with QWDR cavity
  
  

Latest revision as of 11:20, 4 March 2019

No Beam Tasks

  • Re-install Viewer 3 camera
  • Calibrate Viewers
  • Install laser seed and pre-amp (frequency = 500.000 MHz, 0 dBm)
  • Turn on DQWR Deflecting cavity


Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate

  • Check viewers
  • Check magnets
  • Check Harp
  • Check QW Deflecting cavity
  • Measure bunch length with QWDR cavity
  • Check 1-D pepper-pot


Commissioning at 125 kV with Tune Beam

  • Measure beam emittance with Harp
  • Measure beam emittance with 1-D pepper-pot
  • Measure bunch length with QWDR cavity


Commissioning at 125 kV with CW Beam

  • Deliver 100 uA to dump
  • Check TE011 cavity signal


Radiation Survey at 1 mA