Line 6: Line 6:
  
  
= ''' Beam Commissioning at 125 kV''' =
+
= ''' Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate''' =
 
* Check magnets
 
* Check magnets
 
* Check viewers
 
* Check viewers
 +
* Check QW Deflecting cavity
 
*
 
*

Revision as of 17:29, 16 February 2019

No Beam Tasks

  • Re-install Viewer 3 camera
  • Calibrate Viewers
  • Install laser seed and pre-amp at 499 MHz
  • Turn on QW Deflecting cavity


Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate

  • Check magnets
  • Check viewers
  • Check QW Deflecting cavity