Difference between revisions of "GTS meeting 2 18 19"

From Ciswikidb
Jump to navigation Jump to search
Line 10: Line 10:
 
* Check viewers
 
* Check viewers
 
* Check QW Deflecting cavity
 
* Check QW Deflecting cavity
*
+
* Check

Revision as of 17:31, 16 February 2019

No Beam Tasks

  • Re-install Viewer 3 camera
  • Calibrate Viewers
  • Install laser seed and pre-amp at 499 MHz
  • Turn on QW Deflecting cavity


Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate

  • Check magnets
  • Check viewers
  • Check QW Deflecting cavity
  • Check