Difference between revisions of "GTS meeting 2 18 19"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
* Check viewers | * Check viewers | ||
* Check QW Deflecting cavity | * Check QW Deflecting cavity | ||
− | * | + | * Check |
Revision as of 17:31, 16 February 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp at 499 MHz
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check magnets
- Check viewers
- Check QW Deflecting cavity
- Check