= ''' Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate''' = | = ''' Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate''' = | ||
+ | * Check viewers | ||
* Check magnets | * Check magnets | ||
− | * Check | + | * Check Harp |
* Check QW Deflecting cavity | * Check QW Deflecting cavity | ||
− | * Check | + | * Measure bunch length with QWD cavity |
+ | * Check 1-D pepper-pot | ||
+ | |||
+ | |||
+ | = ''' Commissioning at 125 kV with Tune Beam''' = | ||
+ | * Measure beam emittance with Harp | ||
+ | * Measure beam emittance with 1-D pepper-pot | ||
+ | * Measure bunch length with QWD cavity | ||
+ | |||
+ | |||
+ | = ''' Commissioning at 125 kV with CW Beam''' = | ||
+ | * deleiver 100 uA to dump | ||
+ | * Check TE011 cavity signal |
Revision as of 08:30, 17 February 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp (frequency = 499.000 MHz)
- Turn on QW Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check viewers
- Check magnets
- Check Harp
- Check QW Deflecting cavity
- Measure bunch length with QWD cavity
- Check 1-D pepper-pot
Commissioning at 125 kV with Tune Beam
- Measure beam emittance with Harp
- Measure beam emittance with 1-D pepper-pot
- Measure bunch length with QWD cavity
Commissioning at 125 kV with CW Beam
- deleiver 100 uA to dump
- Check TE011 cavity signal