No Beam Tasks

  • Re-install Viewer 3 camera
  • Calibrate Viewers
  • Install laser seed and pre-amp at 499 MHz
  • Turn on QW Deflecting cavity


Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate

  • Check magnets
  • Check viewers
  • Check QW Deflecting cavity
  • Check