GTS meeting 2 18 19

From Ciswikidb
Revision as of 09:54, 24 February 2019 by Suleiman (talk | contribs)
Jump to navigation Jump to search

No Beam Tasks

  • Re-install Viewer 3 camera
  • Calibrate Viewers
  • Install laser seed and pre-amp (frequency = 500.000 MHz, 0 dBm)
  • Turn on QW Deflecting cavity


Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate

  • Check viewers
  • Check magnets
  • Check Harp
  • Check QW Deflecting cavity
  • Measure bunch length with QWD cavity
  • Check 1-D pepper-pot


Commissioning at 125 kV with Tune Beam

  • Measure beam emittance with Harp
  • Measure beam emittance with 1-D pepper-pot
  • Measure bunch length with QWD cavity


Commissioning at 125 kV with CW Beam

  • Deliver 100 uA to dump
  • Check TE011 cavity signal


Radiation Survey at 1 mA