Difference between revisions of "GTS meeting 3 04 19"
Jump to navigation
Jump to search
(Created page with "* List of things to do: # Calibrate new DQW RF power supply up to 500 W # Measure bunch length using new RF supply # Commission TE011 cavity # Measure Drift Emittance at 100,...") |
(No difference)
|
Revision as of 10:09, 4 March 2019
- List of things to do:
- Calibrate new DQW RF power supply up to 500 W
- Measure bunch length using new RF supply
- Commission TE011 cavity
- Measure Drift Emittance at 100, 200 and 300 kV
- Vacuum work to tune DQW cavity