  • List of things to do:
  1. Calibrate new DQW RF power supply up to 500 W
  2. Measure bunch length using new RF supply
  3. Commission TE011 cavity
  4. Measure Drift Emittance at 100, 200 and 300 kV


  • Vacuum work to tune DQW cavity