Difference between revisions of "GTS meeting 3 04 19"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* List of things to do: # Calibrate new DQW RF power supply up to 500 W # Measure bunch length using new RF supply # Commission TE011 cavity # Measure Drift Emittance at 100,...")
 
Line 1: Line 1:
 
* List of things to do:
 
* List of things to do:
# Calibrate new DQW RF power supply up to 500 W
+
# Calibrate new DQWR RF power supply up to 500 W
 
# Measure bunch length using new RF supply
 
# Measure bunch length using new RF supply
 
# Commission TE011 cavity
 
# Commission TE011 cavity
Line 6: Line 6:
  
  
* Vacuum work to tune DQW cavity
+
* Vacuum work to re-tune DQWR cavity

Revision as of 10:10, 4 March 2019

  • List of things to do:
  1. Calibrate new DQWR RF power supply up to 500 W
  2. Measure bunch length using new RF supply
  3. Commission TE011 cavity
  4. Measure Drift Emittance at 100, 200 and 300 kV


  • Vacuum work to re-tune DQWR cavity