Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | * Laser spot walk to make sure spot is round and no clipping | + | * Plans for this week: |
− | + | # Laser spot walk to make sure spot is round and no clipping | |
− | + | # Measure laser size vs laser power | |
+ | # Change laser size: x2 and x0.5 | ||
+ | # Calibrate laser powermeter at exit window vs input window | ||
+ | # Degas Faraday Cup | ||
+ | # Grow new photocathode with full active area | ||
+ | # Beamline bake | ||
+ | # Remove old laser | ||
+ | # Put ND filters in front of YAG creen cameras |
Revision as of 12:43, 6 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size vs laser power
- Change laser size: x2 and x0.5
- Calibrate laser powermeter at exit window vs input window
- Degas Faraday Cup
- Grow new photocathode with full active area
- Beamline bake
- Remove old laser
- Put ND filters in front of YAG creen cameras