Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* Plans for this week: | * Plans for this week: | ||
# Laser spot walk to make sure spot is round and no clipping | # Laser spot walk to make sure spot is round and no clipping | ||
− | # Measure laser size | + | # Measure laser size versus laser power |
# Change laser size: x2 and x0.5 | # Change laser size: x2 and x0.5 | ||
− | # Calibrate laser | + | # Calibrate laser power meter at exit window vs input window |
# Degas Faraday Cup | # Degas Faraday Cup | ||
# Grow new photocathode with full active area | # Grow new photocathode with full active area | ||
# Beamline bake | # Beamline bake | ||
# Remove old laser | # Remove old laser | ||
− | # Put ND filters in front of YAG | + | # Put ND filters in front of YAG Screen cameras to prevent camera saturation |
Revision as of 12:44, 6 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window
- Degas Faraday Cup
- Grow new photocathode with full active area
- Beamline bake
- Remove old laser
- Put ND filters in front of YAG Screen cameras to prevent camera saturation