Difference between revisions of "GTS meeting 4 04 17"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* Plans for this week:
 
* Plans for this week:
 
# Laser spot walk to make sure spot is round and no clipping
 
# Laser spot walk to make sure spot is round and no clipping
# Measure laser size vs laser power
+
# Measure laser size versus laser power
 
# Change laser size: x2 and x0.5
 
# Change laser size: x2 and x0.5
# Calibrate laser powermeter at exit window vs input window
+
# Calibrate laser power meter at exit window vs input window
 
# Degas Faraday Cup
 
# Degas Faraday Cup
 
# Grow new photocathode with full active area
 
# Grow new photocathode with full active area
 
# Beamline bake
 
# Beamline bake
 
# Remove old laser
 
# Remove old laser
# Put ND filters in front of YAG creen cameras
+
# Put ND filters in front of YAG Screen cameras to prevent camera saturation

Revision as of 12:44, 6 April 2017

  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size versus laser power
  3. Change laser size: x2 and x0.5
  4. Calibrate laser power meter at exit window vs input window
  5. Degas Faraday Cup
  6. Grow new photocathode with full active area
  7. Beamline bake
  8. Remove old laser
  9. Put ND filters in front of YAG Screen cameras to prevent camera saturation