Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
# Calibrate laser power meter at exit window vs input window | # Calibrate laser power meter at exit window vs input window | ||
# Degas Faraday Cup | # Degas Faraday Cup | ||
− | # Grow new photocathode with full active area | + | # Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode |
# Beamline bake | # Beamline bake | ||
# Remove old laser | # Remove old laser | ||
# Put ND filters in front of YAG Screen cameras to prevent camera saturation | # Put ND filters in front of YAG Screen cameras to prevent camera saturation |
Revision as of 11:52, 10 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window
- Degas Faraday Cup
- Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode
- Beamline bake
- Remove old laser
- Put ND filters in front of YAG Screen cameras to prevent camera saturation