Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
# Change laser size: x2 and x0.5 | # Change laser size: x2 and x0.5 | ||
# Calibrate laser power meter at exit window vs input window - Done | # Calibrate laser power meter at exit window vs input window - Done | ||
− | # Degas Faraday Cup | + | # Degas Faraday Cup - ''Done'' |
# Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode | # Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode | ||
# Beamline bake - Done | # Beamline bake - Done | ||
# Remove old laser - Done | # Remove old laser - Done | ||
# Put ND filters in front of YAG Screen cameras to prevent camera saturation - Done | # Put ND filters in front of YAG Screen cameras to prevent camera saturation - Done |
Revision as of 17:24, 10 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power - Done
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window - Done
- Degas Faraday Cup - Done
- Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode
- Beamline bake - Done
- Remove old laser - Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation - Done