Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* Plans for this week: | * Plans for this week: | ||
# Laser spot walk to make sure spot is round and no clipping | # Laser spot walk to make sure spot is round and no clipping | ||
− | # Measure laser size versus laser power | + | # Measure laser size versus laser power – ''Done'' |
# Change laser size: x2 and x0.5 | # Change laser size: x2 and x0.5 | ||
− | # Calibrate laser power meter at exit window vs input window | + | # Calibrate laser power meter at exit window vs input window – ''Done'' |
− | # Degas Faraday Cup | + | # Degas Faraday Cup – ''Done'' |
− | # Grow new photocathode with full active area | + | # Grow new photocathode with full active area – ''delayed to next week, will run first with existing limited active area photocathode'' |
− | # Beamline bake | + | # Beamline bake – ''Done'' |
− | # Remove old laser | + | # Remove old laser – ''Done'' |
− | # Put ND filters in front of YAG Screen cameras to prevent camera saturation | + | # Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done'' |
Revision as of 17:25, 10 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power – Done
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window – Done
- Degas Faraday Cup – Done
- Grow new photocathode with full active area – delayed to next week, will run first with existing limited active area photocathode
- Beamline bake – Done
- Remove old laser – Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done