Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
# Degas Faraday Cup – ''Done'' | # Degas Faraday Cup – ''Done'' | ||
# Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited active area photocathode'' | # Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited active area photocathode'' | ||
− | # Beamline bake – ''Done'' | + | # Beamline bake with full NEG activation – ''Done'' |
# Remove old laser – ''Done'' | # Remove old laser – ''Done'' | ||
# Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done'' | # Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done'' |
Revision as of 17:27, 10 April 2017
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power – Done
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window – Done
- Degas Faraday Cup – Done
- Grow new photocathode with full active area – Delayed to next week, will run first with existing limited active area photocathode
- Beamline bake with full NEG activation – Done
- Remove old laser – Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done