Difference between revisions of "GTS meeting 4 04 17"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
 
# Degas Faraday Cup – ''Done''
 
# Degas Faraday Cup – ''Done''
 
# Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited active area photocathode''
 
# Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited active area photocathode''
# Beamline bake – ''Done''
+
# Beamline bake with full NEG activation – ''Done''
 
# Remove old laser – ''Done''
 
# Remove old laser – ''Done''
 
# Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done''
 
# Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done''

Revision as of 17:27, 10 April 2017

  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size versus laser power – Done
  3. Change laser size: x2 and x0.5
  4. Calibrate laser power meter at exit window vs input window – Done
  5. Degas Faraday Cup – Done
  6. Grow new photocathode with full active area – Delayed to next week, will run first with existing limited active area photocathode
  7. Beamline bake with full NEG activation – Done
  8. Remove old laser – Done
  9. Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done