Difference between revisions of "GTS meeting 4 04 17"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* Plans for this week: | * Plans for this week: | ||
+ | # Beamline bake with full NEG activation – ''Done'' | ||
+ | # Degas Faraday Cup – ''Done'' | ||
+ | # Remove old laser – ''Done'' | ||
+ | # Put ND filters in front of YAG Screen cameras to prevent camera saturation – ''Done'' | ||
+ | # Calibrate laser power meter at exit window vs input window – ''Done'' | ||
# Laser spot walk to make sure spot is round and no clipping | # Laser spot walk to make sure spot is round and no clipping | ||
− | # Measure laser size versus laser power | + | # Measure laser size versus laser power |
# Change laser size: x2 and x0.5 | # Change laser size: x2 and x0.5 | ||
− | |||
− | |||
# Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited-active area photocathode'' | # Grow new photocathode with full active area – ''Delayed to next week, will run first with existing limited-active area photocathode'' | ||
− | |||
− | |||
− |
Revision as of 09:01, 11 April 2017
- Plans for this week:
- Beamline bake with full NEG activation – Done
- Degas Faraday Cup – Done
- Remove old laser – Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done
- Calibrate laser power meter at exit window vs input window – Done
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power
- Change laser size: x2 and x0.5
- Grow new photocathode with full active area – Delayed to next week, will run first with existing limited-active area photocathode