GTS meeting 4 04 17

From Ciswikidb
Revision as of 11:52, 10 April 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size versus laser power
  3. Change laser size: x2 and x0.5
  4. Calibrate laser power meter at exit window vs input window
  5. Degas Faraday Cup
  6. Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode
  7. Beamline bake
  8. Remove old laser
  9. Put ND filters in front of YAG Screen cameras to prevent camera saturation