GTS meeting 4 04 17
Jump to navigation
Jump to search
- Plans for this week:
- Laser spot walk to make sure spot is round and no clipping
- Measure laser size versus laser power – Done
- Change laser size: x2 and x0.5
- Calibrate laser power meter at exit window vs input window – Done
- Degas Faraday Cup – Done
- Grow new photocathode with full active area – delayed to next week, will run first with existing limited active area photocathode
- Beamline bake – Done
- Remove old laser – Done
- Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done