GTS meeting 4 04 17

From Ciswikidb
Revision as of 12:43, 6 April 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size vs laser power
  3. Change laser size: x2 and x0.5
  4. Calibrate laser powermeter at exit window vs input window
  5. Degas Faraday Cup
  6. Grow new photocathode with full active area
  7. Beamline bake
  8. Remove old laser
  9. Put ND filters in front of YAG creen cameras