GTS meeting 4 04 17

From Ciswikidb
Revision as of 17:24, 10 April 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size versus laser power - Done
  3. Change laser size: x2 and x0.5
  4. Calibrate laser power meter at exit window vs input window - Done
  5. Degas Faraday Cup - Done
  6. Grow new photocathode with full active area - delayed to next week, will run first with existing limited active area photocathode
  7. Beamline bake - Done
  8. Remove old laser - Done
  9. Put ND filters in front of YAG Screen cameras to prevent camera saturation - Done