GTS meeting 4 04 17

From Ciswikidb
Revision as of 17:25, 10 April 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • Plans for this week:
  1. Laser spot walk to make sure spot is round and no clipping
  2. Measure laser size versus laser power – Done
  3. Change laser size: x2 and x0.5
  4. Calibrate laser power meter at exit window vs input window – Done
  5. Degas Faraday Cup – Done
  6. Grow new photocathode with full active area – delayed to next week, will run first with existing limited active area photocathode
  7. Beamline bake – Done
  8. Remove old laser – Done
  9. Put ND filters in front of YAG Screen cameras to prevent camera saturation – Done