Difference between revisions of "GTS meeting 4 08 19"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
* '''Laser 5 W Fiber Amp will be installed on April 22, 2019'''
 
* '''Laser 5 W Fiber Amp will be installed on April 22, 2019'''
 +
 +
 +
* '''Degas deflecting cavity'''
  
  
Line 9: Line 12:
 
# Commission TE011 cavity
 
# Commission TE011 cavity
 
# Radiation Surveys at 1 mA
 
# Radiation Surveys at 1 mA
# Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm '''completed'''
+
# Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm - '''completed'''
 
# Ghost beam studies with P-Gun
 
# Ghost beam studies with P-Gun

Latest revision as of 12:32, 8 April 2019

  • Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019


  • Laser 5 W Fiber Amp will be installed on April 22, 2019


  • Degas deflecting cavity


  • List of things to do:
  1. Transverse beam emittance measurement with 1D pepper-pot
  2. Commission TE011 cavity
  3. Radiation Surveys at 1 mA
  4. Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm - completed
  5. Ghost beam studies with P-Gun