GTS meeting 4 12 16

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Beamline
    • Viewer solenoid control boxes have been wired up and installed.
    • Bubba is working on the instrument air line
    • The needle valves to control the airflow to the viewer cylinderi have arrived and are in the GTS now
    • Omar reports that as soon as the air is connected we can finish the control work., and that
    • Trigger? not sure....will get someone to locate.
  • Cathode prep chamber
    • Electricians are installing the 100A 50 VDC PS for the Sb deposition
    • Most of the equipment to make cathode is installed in the rack
    • The Cs and the K ampules have been crushed.... and the chamber is still leak tight!
    • The effusion source heater has been installed
    • Effusion source heater installed.jpg
  • High voltage conditioning. [1]
    • Kr processing up to 325 kV. Soaking overnight at 300 kV reduced FE from 1000 CPS to < 50 CPS.
    • Needs more processing
  • Barrel polishing surface characterization: Media:Surface characterization summary.pptx
    • Chris Gould completed the set of samples (anodes and 1cmx1cm samples) characterization using optical ellipsometry
    • Mamun is studying the square samples with the AFM, EDS, etc.