GTS meeting 4 12 21

From Ciswikidb
Revision as of 09:10, 12 April 2021 by Suleiman (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Upgrade Glassman Gun PSS interlock chassis (Scott)
  • Add vacuum interlock to HV supply (Scott)
Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [1]
Plan C: Install spare Spellman 225 kV power supply ( 225 kV, 5 mA). Now at UITF, to be moved to GTS 


  • Beamline - no bake of beamline: (Mamun and Bubba)
    • Replace YAG screens on Viewers 1, 2 and 3
    • Replace leaky right-angle valve
    • Check ion-trap Gun spool
    • Remove Deflecting Cavity and move TE_011 Cavity in its place


  • Prep Chamber: (Mamun)- Completed [2]
    • Fix Transverse Manipulator
    • Fix Sb boat
    • Clean Sb pellets off chamber
    • Clean/check Bottom Heater
    • Add Cs for Robust Photocathode research
    • Clean/replace windows
    • Add pucks with Moly and GaAs (Robust Photocathode) substrates
    • Add Oxygen
Remove Cs/K source
Add K source


  • Gun HV Chamber: (Carlos)
    • Replace Anode
    • Replace Pierce geometry
    • Upgrade anode HV bias feed-through to 5/10 (?) kV


  • Laser: (Shukui)
    • Re-install 500 MHz green fiber laser
    • Install new pulse laser