GTS meeting 4 12 21

From Ciswikidb
Revision as of 10:48, 12 April 2021 by Suleiman (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Upgrade Glassman Gun PSS interlock chassis (Scott)
  • Add vacuum interlock to HV supply (Scott)
Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [1]
Plan C: Install spare Spellman power supply (225 kV, 5 mA). Now at UITF, to be moved to GTS.


  • Beamline - no bake of beamline: (Mamun and Bubba)
    • Replace YAG screens on Viewers 1, 2 and 3
    • Replace leaky right-angle valve
    • Check ion-trap Gun spool
    • Remove Deflecting Cavity and move TE_011 Cavity in its place
Install Electrodynamics Ring Cavity (later)


  • Prep Chamber: (Mamun)
    • Remove Cs/K source
    • Add K source


  • Gun HV Chamber: (Carlos)
    • Replace Anode
    • Replace Pierce geometry
    • Upgrade anode HV bias feed-through to 10 kV


  • Laser: (Shukui)
    • Re-install 500 MHz green fiber laser
Install new pulse laser (later)