(Created page with "* Upgrade Glassman Gun PSS interlock chassis (Scott) * Add vacuum interlock to HV supply (Scott) Plan B: Install Spellman 225 kV power supply. Did not work because we could n...")
 
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
* Add vacuum interlock to HV supply (Scott)
 
* Add vacuum interlock to HV supply (Scott)
 
  Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [https://logbooks/entry/3733466]
 
  Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [https://logbooks/entry/3733466]
 +
Plan C: Install spare Spellman power supply (225 kV, 5 mA). Now at UITF, to be moved to GTS.
  
  
Line 7: Line 8:
 
** Replace YAG screens on Viewers 1, 2 and 3
 
** Replace YAG screens on Viewers 1, 2 and 3
 
** Replace leaky right-angle valve
 
** Replace leaky right-angle valve
** Check ion-trap Gun spool
+
** Check ion-trap Gun spool: Iron trap will not fit on PGun becuase of view ports. Instead, investigate using trap with two beamline solenoids.
 
** Remove Deflecting Cavity and move TE_011 Cavity in its place
 
** Remove Deflecting Cavity and move TE_011 Cavity in its place
 +
Install Electrodynamics Ring Cavity (later)
  
  
* Prep Chamber: (Mamun)- '''''Completed''''' [https://logbooks.jlab.org/entry/3869663]
+
* Prep Chamber: (Mamun)
** Fix Transverse Manipulator
+
** Remove Cs/K source
** Fix Sb boat
+
** Add K source
** Clean Sb pellets off chamber
 
** Clean/check Bottom Heater
 
** Add Cs for Robust Photocathode research
 
** Clean/replace windows
 
** Add pucks with Moly and GaAs (Robust Photocathode) substrates
 
** Add Oxygen
 
Remove Cs/K source
 
Add K source
 
  
  
Line 28: Line 22:
 
** Replace Anode
 
** Replace Anode
 
** Replace Pierce geometry
 
** Replace Pierce geometry
** Upgrade anode HV bias feed-through to 5/10 (?) kV
+
** Upgrade anode HV bias feed-through to 10 kV
 +
** Replace Gun NEG modules with strips
  
  
 
* Laser: (Shukui)
 
* Laser: (Shukui)
 
** Re-install 500 MHz green fiber laser
 
** Re-install 500 MHz green fiber laser
** Install new pulse laser
+
Install new pulse laser (later)

Latest revision as of 10:06, 19 April 2021

  • Upgrade Glassman Gun PSS interlock chassis (Scott)
  • Add vacuum interlock to HV supply (Scott)
Plan B: Install Spellman 225 kV power supply. Did not work because we could not establish remote communication - [1]
Plan C: Install spare Spellman power supply (225 kV, 5 mA). Now at UITF, to be moved to GTS.


  • Beamline - no bake of beamline: (Mamun and Bubba)
    • Replace YAG screens on Viewers 1, 2 and 3
    • Replace leaky right-angle valve
    • Check ion-trap Gun spool: Iron trap will not fit on PGun becuase of view ports. Instead, investigate using trap with two beamline solenoids.
    • Remove Deflecting Cavity and move TE_011 Cavity in its place
Install Electrodynamics Ring Cavity (later)


  • Prep Chamber: (Mamun)
    • Remove Cs/K source
    • Add K source


  • Gun HV Chamber: (Carlos)
    • Replace Anode
    • Replace Pierce geometry
    • Upgrade anode HV bias feed-through to 10 kV
    • Replace Gun NEG modules with strips


  • Laser: (Shukui)
    • Re-install 500 MHz green fiber laser
Install new pulse laser (later)