Difference between revisions of "GTS meeting 4 15 19"

From Ciswikidb
Jump to navigation Jump to search
 
Line 9: Line 9:
  
 
* List of things to do:
 
* List of things to do:
 +
# Measure bunch length using new RF supply
 
# Transverse beam emittance measurement with 1D pepper-pot
 
# Transverse beam emittance measurement with 1D pepper-pot
 
# Commission TE011 cavity
 
# Commission TE011 cavity
 
# Radiation Surveys at 1 mA
 
# Radiation Surveys at 1 mA
 
# Ghost beam studies with P-Gun
 
# Ghost beam studies with P-Gun

Latest revision as of 12:33, 15 April 2019

  • Laser 10 W Fiber Amp will be moved to Hall A Compton on April 11, 2019 - completed


  • Laser 5 W Fiber Amp will be installed on April 11, 2019 - completed, but not functional yet


  • Degas deflecting cavity with RF up to 300 W - completed [1]


  • List of things to do:
  1. Measure bunch length using new RF supply
  2. Transverse beam emittance measurement with 1D pepper-pot
  3. Commission TE011 cavity
  4. Radiation Surveys at 1 mA
  5. Ghost beam studies with P-Gun