GTS meeting 5 02 17

From Ciswikidb
Revision as of 08:45, 2 May 2017 by Chgarcia (talk | contribs)
Jump to navigation Jump to search


  • Attempts to run at 1 mA:
  1. Ran for few seconds before a HV arc. QE dropped by a factor of 2.
  2. Ran again for 1.5 hours (with ion-precipitators on) before a HV arc. QE dropped by another factor of 2.
  3. ion collectors and anode current
  4. The downstream ion collector was wired incorrectly
  5. This is a sketch of the internals of the downstream ion collector VICGT06
  6. Sketch of ion colelcotr internals VICGT06.jpg
  7. These are Cornell's results
  8. Cornell ion clearing results with electrode voltage equation.jpg
  9. Grames paper on anode bias: Media:Grames_PST07_final.pdf
  10. Pozdeyev PAC 2007 ion trapping: Media:Pozdeyev.PDF
  11. Cornell PRAB paper on ion clearing electrodes: Media:Cornell ion colelctors PhysRevAccelBeams.19.034201.pdf
  12. Gabriel's calculation (POISSON model) of the voltage needed in upstream ion collector (VICGT04, wire sticking out of the spool piece): Media:Ion collector VICGT04 wire stikcing out of spool piece.pdf
  13. CEBAF vacuum during 1 mA run
  14. CEBAFvacuum1mA.png
  15. GTS vacuum 1 mA run April 28 2017
  16. Pmceimghkhgmffji.png
  17. GTS 1 mA run also tripped 1.5 hour July 11 2016
  18. Slide09.jpg


  • Down Monday - Wednesday to:
  1. Degas dump with NEGS at 25% on for ion pumps to take vacuum load
  2. Replace ND filter from ND1 to ND3
  3. Re-activate photocathode with 3 mm active area
  4. Instrument wire scanner
  5. Install WiFi access station and enable JMenu on PC in GTS cave
  6. Why is Dump/FC reading -20 nA?
  7. Hi-pot VIPGT06
  8. SCAM VL LINE SYNC frequency is not 60 Hz?
  9. Put ND filter in front of ITVGT06 and mount camera on the floor.