Difference between revisions of "GTS meeting 5 06 19"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]: | * NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]: | ||
** Abstract Submission deadline: 15 May 2019 | ** Abstract Submission deadline: 15 May 2019 | ||
+ | |||
+ | |||
+ | * ATLis Tasks: | ||
+ | # Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun | ||
+ | # Install New Spellman HV Supply at GTS (150 kV, 67 mA) | ||
+ | # Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode | ||
+ | # Install Thermionic Gun at GTS | ||
+ | |||
+ | |||
+ | * TOSP: | ||
+ | # |
Revision as of 13:31, 3 May 2019
- IPAC 2019 [1]:
- Abstracts:
- S. A. K. Wijethunga et al., “Characterization of the Magnetized Electron Beam for the Jleic Electron Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
- S. Zhang, “to be revised”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper THPGW093.
- Proceedings:
- NAPAC 2019 [2]:
- Abstract Submission deadline: 15 May 2019
- ATLis Tasks:
- Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun
- Install New Spellman HV Supply at GTS (150 kV, 67 mA)
- Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode
- Install Thermionic Gun at GTS
- TOSP: