- IPAC 2019 [1]
- NAPAC 2019 [2]:
- Abstract submission deadline: 15 May 2019
- ATLis Tasks:
- Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [3]
- Install New Spellman HV Supply at GTS (150 kV, 67 mA) [4]
- Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [5]
- Install Thermionic Gun at GTS [6]
- TOSP:
- Operation of Thermionic Gun Hot Deck