Difference between revisions of "GTS meeting 5 06 19"

From Ciswikidb
Jump to navigation Jump to search
 
Line 1: Line 1:
* IPAC 2019 [https://ipac19.org/]
 
 
 
 
* ATLis Tasks:
 
* ATLis Tasks:
 
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]
 
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]

Latest revision as of 14:44, 11 June 2019

  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [1]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [2]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [3]
  4. Install Thermionic Gun at GTS [4]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck