Difference between revisions of "GTS meeting 5 06 19"

From Ciswikidb
Jump to navigation Jump to search
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
* IPAC 2019 [https://ipac19.org/]:
+
* ATLis Tasks:
** Abstracts:
+
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]
# S. A. K. Wijethunga et al., “Characterization of the Magnetized Electron Beam for the Jleic Electron Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110, this conference.
+
# Install New Spellman HV Supply at GTS (150 kV, 67 mA) [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19156]
#
+
# Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19158]
** Proceedings:
+
# Install Thermionic Gun at GTS [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19154]
  
  
* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]:
+
* TOSP:
** Abstract Submission deadline: 15 May 2019
+
# Operation of Thermionic Gun Hot Deck

Latest revision as of 14:44, 11 June 2019

  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [1]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [2]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [3]
  4. Install Thermionic Gun at GTS [4]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck