Difference between revisions of "GTS meeting 5 06 19"

From Ciswikidb
Jump to navigation Jump to search
Line 11: Line 11:
  
 
* ATLis Tasks:
 
* ATLis Tasks:
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun
+
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]
 
# Install New Spellman HV Supply at GTS (150 kV, 67 mA)
 
# Install New Spellman HV Supply at GTS (150 kV, 67 mA)
 
# Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode
 
# Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode

Revision as of 13:32, 3 May 2019

  1. Abstracts:
    1. S. A. K. Wijethunga et al., “Characterization of the Magnetized Electron Beam for the Jleic Electron Cooler”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper MOPRB110.
    2. S. Zhang, “to be revised”, presented at the 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, paper THPGW093.
  2. Proceedings:


  • NAPAC 2019 [2]:
    • Abstract Submission deadline: 15 May 2019


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [3]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA)
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode
  4. Install Thermionic Gun at GTS


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck