Difference between revisions of "GTS meeting 5 06 19"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
* IPAC 2019 [https://ipac19.org/]
 
* IPAC 2019 [https://ipac19.org/]
 
 
* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]:
 
** Abstract submission deadline: 15 May 2019
 
  
  

Revision as of 14:43, 11 June 2019


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [2]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [3]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [4]
  4. Install Thermionic Gun at GTS [5]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck