GTS meeting 5 06 19

From Ciswikidb
Revision as of 14:43, 11 June 2019 by Suleiman (talk | contribs)
Jump to navigation Jump to search


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [2]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [3]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [4]
  4. Install Thermionic Gun at GTS [5]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck