  • NAPAC 2019 [2]:
    • Abstract submission deadline: 15 May 2019


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [3]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [4]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [5]
  4. Install Thermionic Gun at GTS [6]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck