Difference between revisions of "GTS meeting 6 10 19"

From Ciswikidb
Jump to navigation Jump to search
Line 3: Line 3:
 
##
 
##
 
##
 
##
 
 
* ATLis Tasks:
 
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]
 
# Install New Spellman HV Supply at GTS (150 kV, 67 mA) [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19156]
 
# Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19158]
 
 
 
* TOSP:
 
# Operation of Thermionic Gun Hot Deck
 

Revision as of 09:29, 17 June 2019

  • NAPAC 2019 [1]:
  1. Abstract: