GTS meeting 6 10 19

From Ciswikidb
Revision as of 19:48, 9 June 2019 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • NAPAC 2019 [1]:
  1. Abstract:


  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [2]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [3]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [4]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck