Difference between revisions of "GTS meeting 6 17 19"
Jump to navigation
Jump to search
(Created page with "* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]: # Abstract: ## ## * ATLis Tasks: # Remove GTS Photogun and its Preparation Chamber to be ready to ins...") |
(No difference)
|
Revision as of 09:27, 17 June 2019
- NAPAC 2019 [1]:
- Abstract:
- ATLis Tasks:
- Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [2]
- Install New Spellman HV Supply at GTS (150 kV, 67 mA) [3]
- Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [4]
- TOSP:
- Operation of Thermionic Gun Hot Deck