(Created page with "* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]: # Abstract: ## ## * ATLis Tasks: # Remove GTS Photogun and its Preparation Chamber to be ready to ins...")
 
 
Line 1: Line 1:
* NAPAC 2019 [https://www.frib.msu.edu/events/2019/napac19/index.html]:
 
# Abstract:
 
##
 
##
 
 
 
 
* ATLis Tasks:
 
* ATLis Tasks:
 
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]
 
# Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19153]

Latest revision as of 09:28, 17 June 2019

  • ATLis Tasks:
  1. Remove GTS Photogun and its Preparation Chamber to be ready to install Thermionic Gun [1]
  2. Install New Spellman HV Supply at GTS (150 kV, 67 mA) [2]
  3. Update SCAM firmware - lower frequencies (0.5 Hz) and shorter pulses (50 ns) for Free Run Mode [3]


  • TOSP:
  1. Operation of Thermionic Gun Hot Deck