GTS meeting 6 18 18

From Ciswikidb
Revision as of 07:57, 18 June 2018 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • GTS updated plan


  • Photocathodes activation with different Sb deposition time (5 mm limited area activation close to the center of GaAs substrate, with 25 A supply to Sb heater):
  1. 30 minutes Sb deposition (completed)
  2. 60 minutes Sb deposition (heat cleaning before second attempt, puck was too hot)
  3. 90 minutes Sb deposition (completed)