(Created page with "*Overview: ** RF power to voltage relation- Complete ** See RF waveform "clipping"- 8/5/19 ** DC bias fix- In Progress ** Quasi-bake of gun- In Progress ** OSP- 8/6-8/7 ** Res...")
 
Line 1: Line 1:
 
*Overview:
 
*Overview:
 
** RF power to voltage relation- Complete
 
** RF power to voltage relation- Complete
** See RF waveform "clipping"- 8/5/19
+
** See RF waveform "clipping"- complete (Need different optical link)
** DC bias fix- In Progress
+
** DC bias fix- needs bench testing
** Quasi-bake of gun- In Progress
+
** Quasi-bake of gun- complete
 
** OSP- 8/6-8/7
 
** OSP- 8/6-8/7
** Resume HV processing- M/D/Y
+
** HV processing- In progress
** HV processing with solenoid on- M/D/Y
+
** HV processing with solenoid on- sometime in the future
** RF matching- M/D/Y
+
** RF matching- sometime way in the future
 +
 
 +
*Talking points:
 +
** HV Processing over the weekend
 +
** Krypton processing?
 +
** Double click on the dial; not around it
 +
** Optical-fiber link (need check voltage output of current unit and order)
 +
** Run without RF to have something for NAPAC (doesn't require DC Bias fix)

Revision as of 10:20, 12 August 2019

  • Overview:
    • RF power to voltage relation- Complete
    • See RF waveform "clipping"- complete (Need different optical link)
    • DC bias fix- needs bench testing
    • Quasi-bake of gun- complete
    • OSP- 8/6-8/7
    • HV processing- In progress
    • HV processing with solenoid on- sometime in the future
    • RF matching- sometime way in the future
  • Talking points:
    • HV Processing over the weekend
    • Krypton processing?
    • Double click on the dial; not around it
    • Optical-fiber link (need check voltage output of current unit and order)
    • Run without RF to have something for NAPAC (doesn't require DC Bias fix)