GTS meeting 8 26 19

From Ciswikidb
Revision as of 09:59, 26 August 2019 by Suleiman (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Update:
    • Replaced thermionic cathode
    • Added leak valve on mini-flange
    • Started Kr processing


  • Talking Points:
    • Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)