GTS meeting 8 28 17

From Ciswikidb
Revision as of 14:17, 25 August 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
  • Emittance Measurements - Yan


  • New plan:
  1. Finish emittance measurements, including a larger laser size (x4) – August 21-25
  2. Attempt 5 mA (non-magnetized, then magnetized) – August 28-31
  3. Shutdown – September 5:
    1. Install new YAG screen at viewer 3
    2. Fix existing harp and install 20 µm tungsten wire
    3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)