GTS meeting 8 28 17

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Emittance Measurements with large laser size (rms=0.423mm) - Yan: [1]


  • New plan:
  1. Finish emittance measurements, including a larger laser size (x4) – August 21-25
  2. Attempt 5 mA (non-magnetized, then magnetized) – August 28-31
  3. Shutdown – September 5:
    1. Install new YAG screen at viewer 3
    2. Fix existing harp and install 20 µm tungsten wire
    3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
    4. Replace leaky vent valve
    5. Replace bad ion pump
  4. Next Shutdown – December 2017:
    1. Install TE011 cavity