GTS meeting 9 09 19

From Ciswikidb
Revision as of 09:58, 9 September 2019 by Fhannon (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Update:
    • Kr processing attempted - not really successful.
    • 2 days under vacuum at 120kV, but with radiation increasing.
    • Spare cathode is dead
  • Talking Points:
    • Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)
    • Magnetizing solenoid PS may be used in LERF for a while for isotopes.
  • Suggested Actions:
    • Open up the gun - look for damage (take care with cathode)
    • Install the glassman supply as an alternative HVPS source
    • One final change to the grounding of the Spellman, where HVPS chassis is grounded in the vault