GTS meeting 9 11 17

From Ciswikidb
Revision as of 08:00, 11 September 2017 by Suleiman (talk | contribs) (Created page with "* High current runs * Shutdown Plan: ## Install new YAG screen at viewer 3 ## Fix existing harp and install 20 µm tungsten wire ## Add a new CEBAF-style harp with 10 µm t...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • High current runs


  • Shutdown Plan:
    1. Install new YAG screen at viewer 3
    2. Fix existing harp and install 20 µm tungsten wire
    3. Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
    4. Replace leaky vent valve
    5. Replace bad ion pump


  • Next Shutdown – December 2017:
    1. Install TE011 cavity