GTS meeting 9 30 19
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
(1) Get GTS back to operational
To Fix List (to get GTS running):
- Glassman PSS Chassis (Service request to Omar - Carlos)
- LCW Chassis (Sarin- Fay follow up)
- Spellman (should arrive today)
- Picoammeter x2? (Pete Francis in hand - sent for fix)
- Viewers insertion boxes bad
To Check:
- Magnets (IOC check)
- Cathode solenoid - power supply
Good
- Harp (fuse replaced)
- Cavities (electronics)
- Turbo (fixed itself)
(2) T-Gun Upgrades
Need a safe gun - no devastating trips. Limit voltage to 135kV
RF cage - Features:
- HV attaches through the back as designed.
- G10 plate to support the HV cable
- Nitrogen flow, also through G10 plate aimed at the back of the hot deck
- Nitrogen flow, though the top of the cage, aimed at ceramic
- Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
To Fix/Modify:
- DC bias supply - set point fix (John Musson)
- RF Cage (Mark/Fay)
- Back plate to allow increased cooling (open the hole - Fay talk to Vince)
- Software issues (Karl to contact Spellman again)
- Install new fiber link & check (CW setting - Mark emailed company)
(3)
Housekeeping:
- Remove RXX cables from GTS
- Remove JLab spellman
- Sort out the air and nitrogen lines.
- Buy a shop vac (ask Bubba)